Our flatwork projects are done with
pride and customer satifaction.
- area is prepped, packed with
sand
- rebar grid connected to foundation
- fiberglass used for strength
- graded slope for ease of drainage
- all basements have poured walls
- openers on each garage door
with lifetime guarantee
- basement plumbing rough in
- tile around the exterior foundation
goes to sump pump wheen needed
There are multiple lots available to
build a new home within blocks of the elementary school and adjacent
lots to the high school football field!
Lichty Construction is state and locally
licensed and fully insured. We specialize in new construction, additions
and remodels.
We believe it's realistic to expect
to be in a home in 3 to 5 months once framing begins. The only variance
of move in date would be weather delays, home owner making multiple
changes during the building process or special order items with lengthy
delivery schedules.
|